A product launch creative checklist is the list of assets a team must finish before a product goes live on paid, owned, and earned channels. A complete launch set has 14 assets: a hero key visual, product cutouts, lifestyle photos, ad sizes for each channel, a video cut-down, a landing page hero, email graphics, social carousels, press and deck files.
The key is to make them in the right order so each asset can reuse the one before it. This reduces duplicated work, prevents missing formats, and gives every team member a clear production target before launch day.
Why launch creative fails at the last minute

Launch teams usually finish the product on time and the creative late. The creative is then rushed, sizes are missed, and the same product photo runs everywhere at the wrong crop.
A checklist written two weeks before launch gives the design work a fixed order and a fixed owner. Instead of discovering missing assets on launch day, the team can track every deliverable and resolve gaps while there is still time.
The 14 assets

A complete launch set should cover every channel where the product will be promoted. Use this list to define the deliverables, their purpose, and the source material needed to create each one.
| # | Asset | Used for | Made from |
|---|---|---|---|
| 1 | Hero key visual (one master image) | Every channel, the anchor for all others | Brief and brand pack |
| 2 | Product cutouts on white and on brand colour | Ads, marketplaces, email | Product photo |
| 3 | Lifestyle photos (3 to 5) | Social, paid ads, landing page | Photo shoot or approved stock |
| 4 | Static ad set: 1:1 and 4:5 | Feed placements | Key visual |
| 5 | Stories and Reels set: 9:16 | Vertical placements | Key visual |
| 6 | Video cut-down, 15 seconds | Paid video, Reels | Shot list and footage |
| 7 | Landing page hero, desktop and mobile | Launch page | Key visual |
| 8 | Email header and product block | Launch email | Key visual and cutouts |
| 9 | Social carousel (5 to 7 slides) | Organic social | Lifestyle photos |
| 10 | Teaser graphic or short clip | Pre-launch countdown | Key visual |
| 11 | Open Graph and link preview image | Shared links | Key visual, resized |
| 12 | Press kit: logo, product images, one-page fact sheet | Journalists and partners | All of the above |
| 13 | Sales deck slide or one-pager | Sales and partner calls | Key visual and copy |
| 14 | Ad copy and approved claims sheet | Every ad | Brief |
Not every asset needs to be designed independently. The hero key visual acts as the visual foundation, while product cutouts, lifestyle photography, and approved copy provide the source material for the remaining deliverables.
The order to make them in

The order matters because some assets depend on decisions and files that need to be approved first. Follow this sequence to avoid designing deliverables around unfinished messaging or visuals.
- **Lock the brief and the claims sheet (item 14) first.** Nothing else can be approved without it.
- **Create the hero key visual (item 1).** Every other asset is derived from it.
- **Make the cutouts and lifestyle photos (items 2 and 3).** This allows ad and page designers to work in parallel.
- **Build the ad sets, the landing page, and the email (items 4, 5, 7, and 8).** These are the main channel deliverables.
- **Make the video and the social pieces (items 6, 9, and 10).** Use the approved visuals and messaging.
- **Finish the shared files last: the link image, the press kit, and the sales deck (items 11, 12, and 13).** These can reuse the completed launch materials.
File and size rules that prevent rework
Even when the creative itself is approved, incorrect exports can create last-minute problems. Set file rules before production starts so every designer and channel owner works from the same standards.
- Build the master file at the largest size, then export down. Never resize a small export up.
- Keep all text at least 5% away from the edges of vertical placements, where the platform interface can cover it.
- Name every file with the product, the asset number, the size, and the version date.
- Export the press kit images at print resolution and the ad images at web resolution, in separate folders.
Sign-off before launch day
Set one approver for the claims sheet, one for the brand look, and one final person who confirms that every link and price matches the live product page.
Two days before launch, run the full checklist in a single review, not in pieces. Items that fail go back to their owner with the asset number. This gives the team a clear way to identify and resolve outstanding work.
What to do after launch
Keep the master files in one shared folder. Within a week, you may need new sizes, a sold-out version, or a comparison ad, and those are faster to make from the original files.
Record which assets performed best, so the next launch starts with the proven hooks. Keeping the original files and performance notes together also makes it easier to reuse successful creative decisions.
For the testing side of launch ads, see the ad creative testing framework. For the team model that delivers a launch set without a full in-house team, read the campaign agency without an in-house team guide.
Related guides
- Creative brief template for designers: Writing the brief for the launch asset list.
- Ad creative service: A team that produces a full launch asset set.
Frequently asked questions
What assets does a product launch need?
A complete launch set usually includes a hero key visual, product cutouts, lifestyle photos, static ads in 1:1 and 4:5, 9:16 Stories and Reels, a video cut-down, a landing page hero, email graphics, social carousels, a link preview image, a press kit, a sales deck, and an approved claims sheet.
How far ahead should launch creative be finished?
Finish the hero visual and the claims sheet at least two weeks before launch day. That leaves time for the ad sets, the page, and the email to be built and reviewed in parallel.
What is the most important launch asset?
The hero key visual. Every other asset is derived from it, so a weak hero makes every ad weaker. Approve it before anything else is built.
Do I need a new photo shoot for every launch?
Not always. A product with good cutouts and three or four lifestyle images can support most launches. Plan a shoot when the product changes, when the existing images do not show the new use, or when no approved image covers the audience.

